Project Name: Ningbo Yizan Magnetic Industry Co., Ltd. produces 1000 tons of high-performance magnetic materials per year. Construction unit: Ningbo Yizan Magnetic Industry Co., Ltd. construction location: Ningbo Yizan Magnetic Industry Co., Ltd. construction content: in June 2016, Beijing Bocheng Lixin Environmental Technology Co., Ltd. was entrusted to prepare and complete the annual output of 1000 tons of high-performance magnetic materials by Ningbo Yizan Magnetic Industry Co., Ltd In June 2016, Ningbo Yinzhou District Environmental Protection Bureau approved the environmental impact assessment report of the project with "yhj [2016] No. 0333" and agreed to the implementation of the project. The project was put into operation in May 2015. The actual total investment of the project is 5 million yuan and the investment in environmental protection is 100000 yuan. It accounts for about 2.0% of the total investment of the project. Implementation of environmental protection 1. Waste gas of the project mainly includes vacuum exhaust gas of vacuum sintering furnace and loading and unloading waste gas of workshop. The vacuum exhaust gas of vacuum sintering furnace is collected and discharged through 15m exhaust funnel, and the loading and unloading waste gas is discharged through ventilation. 2. Wastewater the project has no production wastewater, mainly domestic sewage. After pretreatment in septic tank, domestic sewage is incorporated into the municipal government's sewage pipe network and finally discharged into Xinzhou sewage treatment plant for centralized treatment. 3. Noise the noise of the project is mainly the mechanical noise generated by the test of air mill and other equipment. For the noise of various equipment, sound insulation, vibration reduction and other measures have been taken. 4. Solid waste the solid waste of the project mainly includes waste engine oil, oily plastic bags, domestic garbage, coarse powder and powder impurities. Coarse powder and powder impurities are collected in special barrels and temporarily stored for sale; Waste engine oil and oily plastic bags shall be entrusted to a qualified unit for safe treatment; The domestic garbage of employees shall be entrusted to the environmental sanitation department for unified treatment. Publicity period: from May 29, 2018 to June 30, 2018 (20 working days), the public's comments and suggestions on the construction project can be reflected to the construction unit within the publicity period. Please leave your contact information (name, address, telephone or e-mail) for timely response and feedback. Name of construction unit: Ningbo Yizan Magnetic Industry Co., Ltd. contact person: long Zong Tel.: 15888002339 http://www.cnyzcy.com/login/snews/more.asp?id=7